Te Uku Wind Farm

Infrastructure
Value-added Engineering

The Te Uku Wind Farm project, a pioneering effort in the upper North Island, involved constructing access roads, 28 turbine foundations, and extensive erosion control measures across challenging terrain.

Client
Meridian Energy
Status
Complete
duration
2009 - 2010
Location
Raglan
volume of earthwork

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Volume of Earthworks

800,000m3

No. of Turbines

28

Te Uku Wind Farm

Brief

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Solution

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Te Uku Wind Farm, located south of Raglan Township in the Waikato, marked a significant milestone as the first wind farm in the upper North Island. The civil works package for this ambitious project, executed between November 2009 and October 2010, encompassed the construction of access roads, foundations, and associated facilities across four existing farms in challenging terrain.

Key highlights of the major construction contract included moving a staggering 800,000m³ of earth, establishing a purpose-built 26km road network for the transportation of heavy wind turbine components, and implementing extensive erosion and sediment control measures involving up to 170 devices. Additionally, an onsite concrete batching plant was set up to support construction activities.

The intricate process also involved crafting 28 turbine foundations, each requiring 1335 tonnes of reinforcing steel and 12,000m³ of concrete. Further tasks encompassed positioning electrical conduits, installing free-issue holding down bolts, and casting onto foundations. The installation of 70km of high-voltage electrical cables connecting turbine sites to the substation, as well as the construction of the substation platform and building foundations, were integral to the project.

Cultural engagement with the local Iwi, Ngati Mahanga, played a pivotal role in the project's success. This included conducting site ceremonies, respecting the Pa Site during observation works, and creating employment opportunities for the local community.

Services & scope of work

Turbine Platforms
Bulk earthworks
Concrete Batching Plant
Roading Construction
Clearing
Quarry Management
Stabilising
Drainage

Project highlights

Environmental

Erosion and Sediment Control Site of the Year Award from Environmental Waikato

Programme

Delivered 7 weeks ahead of time

Construction

NZ Contractors Federation Construction Award for Category 3: Projects valued at $10-$50 Million

No items found.

More Projects

View all projects
LEAD Alliance
Alliancing
Value-added Engineering
Client
Kainga Ora
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2018 - Present

LEAD Alliance

View project
Milldale
Earthworks
Civil Construction
Value-added Engineering
Client
Fulton Hogan Land Development
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2017 - Present

Milldale

View project
Millwater
Earthworks
Civil Construction
Value-added Engineering
Client
WFH Properties
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2007 - Present

Millwater

View project
Waikato Expressway
Value-added Engineering
Infrastructure
Alliancing
Client
City Edge Alliance
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2016 - 2022

Waikato Expressway

View project
Tauhara Geothermal
Infrastructure
Value-added Engineering
Client
Contact Energy
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2021

Tauhara Geothermal

View project
Harapaki Wind Farm
Infrastructure
Value-added Engineering
Client
Meridian Energy
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2021 - 2023

Harapaki Wind Farm

View project
Rangitahi
Civil Construction
Earthworks
Value-added Engineering
Client
Rangitahi Ltd
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2019 - 2023

Rangitahi

View project
Waiata Shores
Infrastructure
Civil Construction
Value-added Engineering
Client
Fletcher Living
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2016 - 2024

Waiata Shores

View project
Three Kings
Civil Construction
Earthworks
Value-added Engineering
Client
Fletcher Living
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2019 - Present

Three Kings

View project
Beachlands
Infrastructure
Civil Construction
Value-added Engineering
Client
The Neil Group
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2022 - Present

Beachlands

View project