Rangitahi

Civil Construction
Earthworks
Value-added Engineering

The transformation of Raglan peninsula farmland into an urban development addressed environmental challenges with innovative solutions like the Autofloc system for proactive rainfall event management. The project involved spanned bulk earthworks, geotechnical remediation, and extensive infrastructure projects, emphasising environmental stewardship and adaptability to the area's unique demands.

Client
Rangitahi Ltd
Status
Complete
duration
2019 - 2023
Location
Raglan
volume of earthwork

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Volume of Earthworks

750,000m3

No. of Lots

Over 200 Residential Lots, 10 Commercial Lots and 5 Council Reserves

Rangitahi

Brief

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Solution

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Transforming farmland on the Raglan peninsula into an urban residential development involved multiple contracts covering diverse aspects such as bulk earthworks, geotechnical remediation, streamworks, roading, concrete works, stormwater and wastewater drainage, wastewater pump station installation, water reticulation, and utilities installation. Recognizing the environmental challenges posed by catchments leading directly into the harbor, the site's remoteness, and the unpredictability of the microclimate, stringent controls were implemented. Real-time monitoring, weekly winter works reporting, and monitoring were integral to risk mitigation.

Addressing environmental concerns, Hick Bros deployed its patented Autofloc system, allowing remote monitoring of treatment devices and proactive dosing ahead of anticipated rainfall events. This innovative approach not only showcased the company's commitment to environmental stewardship but also demonstrated adaptability to the unique challenges posed by the Raglan peninsula development. The comprehensive strategy employed by Hick Bros reflects a dedication to responsible urban development, ensuring both the sustainability and environmental resilience of the transformed landscape.

Services & scope of work

Box Culverts
Bulk earthworks
Shear Keys
Stream Works
Roading Construction
Concrete Works
Stormwater Networks
Low Pressure Sewers
Wastewater Rising Main
Wastewater Pumpstation
Water Reticulation
Utilities

Project highlights

Value Added Engineering

Through carefully planned blending with appropriate machinery, and earthwork methods, the surpose of unsuitable material on site was placed as engineered fill. Saving both cost and time.

Environmental

Successful installation of 1200mm diameter culvert within a live stream environment involving stream flow diversion without disruption of fish passage.

Sustainability

In order to reduce waste on site, Hick Bros introduced an intricate recycling scheme. This not only included separating waste into multiple bins but also involved working with suppliers, such as Humes, to develop a ‘first of it’s kind’ recycling scheme for PVC and PE pipe to be melted down and remanufactured for use.

No items found.

More Projects

View all projects
LEAD Alliance
Alliancing
Value-added Engineering
Client
Kainga Ora
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2018 - Present

LEAD Alliance

View project
Milldale
Earthworks
Civil Construction
Value-added Engineering
Client
Fulton Hogan Land Development
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2017 - Present

Milldale

View project
Millwater
Earthworks
Civil Construction
Value-added Engineering
Client
WFH Properties
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2007 - Present

Millwater

View project
Waikato Expressway
Value-added Engineering
Infrastructure
Alliancing
Client
City Edge Alliance
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2016 - 2022

Waikato Expressway

View project
Tauhara Geothermal
Infrastructure
Value-added Engineering
Client
Contact Energy
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2021

Tauhara Geothermal

View project
Te Uku Wind Farm
Infrastructure
Value-added Engineering
Client
Meridian Energy
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2009 - 2010

Te Uku Wind Farm

View project
Harapaki Wind Farm
Infrastructure
Value-added Engineering
Client
Meridian Energy
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2021 - 2023

Harapaki Wind Farm

View project
Waiata Shores
Infrastructure
Civil Construction
Value-added Engineering
Client
Fletcher Living
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2016 - 2024

Waiata Shores

View project
Three Kings
Civil Construction
Earthworks
Value-added Engineering
Client
Fletcher Living
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2019 - Present

Three Kings

View project
Beachlands
Infrastructure
Civil Construction
Value-added Engineering
Client
The Neil Group
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2022 - Present

Beachlands

View project