Manukau Golf

Auckland
Earthwork & Civils

Largescale earthworks and civils have been taking place on our Manukau Golf Course site since September 2017. Hicks have increased flood capacity with the construction of a major overland flow path, four barrel box culvert and a 8m wide diversion channel either side. Construction on the 250,000 cubic metre site also includes two major wetlands, the installation of a 900m sanitary sewer (up to 9m deep at 0.3% grade), and a signalised intersection on Great South road.

Manukau Golf

Manukau Golf
September 01, 2017 – August 30, 2017 (Stage 1)-October 30, 2017 (Stage 2)