ARRAN POINT

MILLWATER, AUCKLAND
BULK EARTHWORKS

Bulk Earthworks have been taking place at our Millwater site since November 2015. The largescale earthworks cover around one million cubic meters of the Arran Hill site and include retaining structures, palisade piles and shear keys. The site has been no easy feat for our team; sensitive overlaying soils and proximity to the Orewa Estuary has continually tested us and our machines within our tight time frame.

ARRAN POINT

Precinct 5 – Arran Hill
November 2015 – April 2018

Top of the World

Workers pose at the top of a reinforced eath wall